CHRS Knowledge Base

LCD Combo Code Add (CHRSMP3.00)

Updated on

Overview

This job aid shows campus LCD users how to add a combo code . The Combo Code Add process allows campuses to create one Combo Code at a time and replaces the Combo Code Build process that campuses originally used.

Create the new combo code

Step 1: Open the Navbar button.

Navbar button

Step 2: Navigate to Menu > Set Up HCM > CSU Product Related Setup > CSU LCD Setup > CSU Combo Code Add

Step 3: Search for your Run Control ID. If you do not have a run control ID, click Add a New Value to create one.

The run control should have your campus two digit code and be unique to you. Run Controls are not shared and should be specific to the person completing the process.

Run control ID search

Step 4: Complete the Fields:

  • SetID
  • DeptID
  • Fund
  • GL Account
  • Dept/Fund Value
  • Combo Code Description
Required fields

Step 5: Optional: Complete Optional Fields:

  • Class/Prog/Proj Value
  • Class Field
  • Project/Grant
  • Program Code
optional fields

Step 6: Decide whether to check the Preliminary Test check box.

  • Check this box to review changes before finalizing.
  • Clear the box to run the process and commit the changes.

If you run the process with the box checked, you must re-run the process with the box cleared to create the combo code.

CSU Combo Code Add - Google Chrome

Step 7: Click Run.

Run btton

Step 8: On the Process Scheduler Request, click OK.

Process Scheduler Request

Step 9: Open Process Monitor.

Process Monitor link

Step 10: Click Refresh until the Distribution Status is Posted.

Distribution status is posted

Step 11: Click the process name: CSUBE8CC.

CSUBE8CC process

Step 12: View the reports:

  1. Click the report.
  2. Click View Log/Trace.
  3. Click the report to view from the File List.
A. List of reports. B. View Log/Trace. C. File list
Report Purpose
CSUBE800 Confirms that the Application Engine Program ended normally without issues
CSUBE801
Provides a PDF Output Report regarding the errors that occurred or what was successfully updated. If the "Preliminary Test" box  was checked, then the successful report will have ""Preliminary" in the title.
CSUCCSYN
Confirms the Combo Code Sync process was able to run successfully.  
If the process is run with the "Preliminary Test" box checked, then you must run it again WITHOUT the "Preliminary Test" box checked to create the new Combo Code.

End of article

Review the reports

0 Comments

Add your comment

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Previous Article (job aid) EXTENSION NON-CREDIT (14) Appointment Notification EXAMPLE (CHRSMP3.00)
Next Article (job aid) LCD Combo Code Update (CHRSMP3.00)
Do you need an article? Contact Us